Government contractor / road infrastructure

Engineering roads.
Building trust.

Delivering reliable infrastructure through precision engineering, quality construction and accountable execution.

Class A road enlistment / Uttarakhand PWD
SHIVA
ASSOCIATE
INFRASTRUCTURE / 01Built with intent.
Delivered with control.
Class AUttarakhand PWD road enlistment
2Documented completed road works
INR 1.86 CrRecorded actual value on NH-87 work
INR 72 LFinancial resources recorded in bid forms

01 / Company

A measured approach to public infrastructure.

Shiva Associate is a proprietorship road works contractor represented in the submitted records by Neeraj Kumar. The company combines PWD enlistment, documented completion records, road plant, technical personnel and tender-ready financial information.

Meet the company ↗

The work is practical: understand the corridor, plan the sequence, control each layer and leave a clear record of what was delivered.

ConstitutionProprietorship
PWD positionClass A - Road
GSTIN05AEZPN4411K1Z3
Registered officeHaridwar, Uttarakhand

02 / Capabilities

From formation to finish.

A focused service set for roads, highways, maintenance and associated civil execution.

View all services ↗
01

Road construction

Formation, pavement and finishing works delivered through measured sequencing and site control.

↗
02

Highway repair and strengthening

Repair and strengthening work for state and national highway corridors, including the NH-87 record.

↗
03

Bituminous works

WBM, GSB, WMM, prime coat, tack coat, BM, SDBC, DBM, BC and road marking.

↗
04

Earthwork and formation

Hill-side cutting, embankment preparation, walling and formation-level execution.

↗
05

Drainage and road edges

Drainage interfaces, shoulders, culvert-related work and finishing around the pavement edge.

↗
06

Survey and quantity control

Alignment, chainage, levels, quantities, measurements and completion documentation.

↗

03 / Method

A clear sequence makes quality visible.

Road delivery depends on transitions: survey into plan, plan into layers, layers into a finished corridor.

Controlled delivery path

Survey
Plan
Earthwork
Subgrade
GSB
WMM
Prime coat
Tack coat
Bituminous
Testing
Marking
Handover

Pavement build-up

BITUMINOUS COURSEcontrolled layer
WMMcontrolled layer
GSBcontrolled layer
PREPARED SUBGRADEcontrolled layer

Survey → levels → placement → compaction → testing

04 / Project record

Work that can be understood.

Selected documented road works from the supplied company records, presented with scope, location, value and delivery context.

See project records ↗
SHIVA
ASSOCIATE
INFRASTRUCTURE / 01Built with intent.
Delivered with control.

2019-2021 / Completed

Gular Bhayara Dhanora Jamnoli Motor Marg

Tehri Garhwal, Uttarakhand

PWD Uttarakhand, Construction Division Narendra NagarINR 1,92,18,182.00 actual

05 / Start a conversation

The next road starts with a clear brief.

For tender correspondence, client meetings and project enquiries, contact Shiva Associate directly.

Contact us ↗

Direct contact

8077412707
shivaassociatekin@gmail.com

28/4224/2 Shiv Vihar Exchange Road, Saharanpur 247001, Uttar Pradesh

Behedeki Saidabad, near Iqbalpur Petrol Pump, Haridwar 247668, Uttarakhand